Inspection Services for Curtis Creek Elementary School Water System Consolidation Project – CLOSED

The Tuolumne Utilities District (District) is seeking Inspection Services to oversee the construction of a new water main along Standard Road in Sonora, Tuolumne County. The Project consists of the installation of approximately 5,535 linear feet of 12-inch, 240 linear feet of 6-inch, 185 linear feet of 4-inch, and 190 linear feet of 3-inch water main, including 4 fire hydrants, 2 air/vac valves, and appurtenances. It is the District’s intention to begin construction of the new water main in the Spring/Summer of 2022 with a construction duration of 60 calendar days. The Inspector shall be on-site every day during active construction for the duration of the project. The estimated cost of the project is approximately $1.68 Million and will be funded by the California State Water Resources Control Board.

For more information, click the link for Inspection Services.

Date Posted
Wednesday, December 29, 2021
Bid Closes
Friday, January 21, 2022 by 2:00 PM
Contact
Cyndi Schlenz
Engineering Coordinator
Tuolumne Utilities District
p: 209-532-5536 x ext. 512
a: 18885 Nugget Blvd | Sonora, CA 95370
e: cschlenz@tudwater.com
Scroll to Top