Ridgewood Intertie Paving-CLOSED

Tuolumne Utilities District is seeking contractor interest in the Ridgewood Intertie Paving Project. The project will consist of pavement restoration on Phoenix Lake Road, Sommette Drive, Resort Road, and Meadow Brook Drive. Three different types of restoration are proposed, 1. full lane width grind and overlay, 2. “T” Trench on Phoenix Lake Rd., and 3. “T” Trench on Minor Roads. The location and quantity of each restoration will depend on the awarded bid schedule. The project is located in Tuolumne County, CA on Phoenix Lake Road between Meadow Brook Drive and
Resort Road.

Sealed proposals for the construction of the Ridgewood Intertie Paving addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received
at the office of the District until 2:00 p.m., local time, on June 17, 2022, and will then be publicly opened and read.

Invitation to Bid – Contract Documents
Map and Details

 

Date Posted
May 31, 2022
Bid Closes
June 17, 2022 by 2:00 p.m.
Contact
Cyndi Schlenz at (209) 532-5536 ext. 512 or
cschlenz@tudwater.com
Scroll to Top