Ridgewood Pipeline Project-CLOSED

Sealed proposals for the construction of the Ridgewood Pipeline Consolidation Project addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on the 1st of July, 2022, and will then be publicly opened and read.

In general, the project will consist of the installation of approximately 6,871 linear feet of 8-inch C900 potable water main, including any necessary appurtenances on Phoenix Lake Road, in Tuolumne County, CA.

To request an Invitation to Bid and a digital copy of the plans and specifications, please contact Ms. Jennifer Batt at (209) 532‑5536 ext. 526 or jbatt@tudwater.com.  Project information, bid documents, plan set, and addenda can be found on the District’s website at https://tudwater.com/development-services/bids/.

Proposals shall be prepared in accordance with the requirements set forth in the Contract Documents, on the forms therein or copies thereof.  Upon being awarded the contract, Contractor shall provide a 100% Public Works Payment Bond and a 100% Performance Bond.  No Proposal will be accepted from a contractor who has not been licensed in accordance with the laws of this State to perform the work herein described and who does not possess a Class A license or its equivalent for the type of work called for under this project.  Prevailing wage rates apply.

The Contract time for performance is 70 calendar days from the date specified in the written Notice to Proceed.  Expected project completion timeframe shall be October, 2022.

Project Documents
Invitation to Bid
Contract Documents
Plans

Addendum No. 1 – June 29, 2022

Date Posted
June 8, 2022
Bid Closes
July 1, 2022 by 2:00 p.m.
Contact
Cyndi Schlenz
Engineering Coordinator
Tuolumne Utilities District
209-532-5536, ext. 512
Email: cschlenz@tudwater.com
Scroll to Top