Techite Pipeline Replacement Project-Phase II – CLOSED

Sealed proposals for the construction of the Techite Pipeline Replacement Project – PHASE II addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on April 2, 2021, and will then be publicly opened and read.

In general, the project will consist of the replacement of 2,000 linear feet of 8-inch Techite water main with two (2) 12-inch PVC C900 DR 14 water main and appurtenances. Pipeline construction will occur outside of roadways on a cross country route. Extended water shutoffs will not be allowed. Contractors shall maintain service to downstream customers via temporary bypass or other approved means.

A mandatory pre-bid conference will be held at the District’s Administration Building at 18885 Nugget Blvd., Sonora, California at 9:00 a.m. on Thursday, March 18, 2021 and at 10:00 a.m.  on March 22nd. Bidders may choose one meeting to attend and will not be required to attend both. Proposals will only be accepted from contractors represented at one of the pre-bid conferences.

To request an Invitation to Bid and a digital copy of the plans and specifications, please contact Mrs. Makayla Dillon at (209) 532-5536 ext. 512 or mdillon@tudwater.com. Project information and addenda can be found on the District’s website: https://tudwater.com/development-services/bids/.

PROJECT DOCUMENTS
PROJECT PLAN SET DOCUMENT
Addendum No. 4 – Posted March 19, 2021
Addendum No. 3 – Posted March 15, 2021
Addendum No. 2 – Posted March 12, 2021
Addendum No. 1- Posted February 26, 2021

Notice is hereby given to prospective bidders that the Bid Documents for the above referenced project have been modified as hereinafter set forth. See attached Addendum No. 1.

Sealed proposals for the construction of the Techite Pipeline Replacement Project – PHASE II addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on March 26, 2021, and will then be publicly opened and read.

Post Date:
February 18, 2021

Mandatory Pre Bid Date:
Thursday, March 18, 2021 at 9:00am

Due Date:
April 2, 2021 by 2:00 PM

Click here to view project documents

Share on facebook
Share on twitter
Share on linkedin
Share on email
Date Posted
February 18, 2021
Bid Closes
April 2, 2021 by 2:00 PM
Contact
Ms. Makayla Dillon
Tuolumne Utilities District
Management Analyst
mdillon@tudwater.com
209-532-5536 x 512
Scroll to Top