Techite Pipeline Project

Techite Pipeline

District personnel respond to mainline breaks multiple times each year on the segment of Techite pipeline from the Crystal Falls Water Treatment Plant to Middle Camp Road. This pipe segment functions as a transmission main serving thousands of downstream customers. Techite pipe is an obsolete material that has proven to be very fragile. When the pipeline breaks, it ruptures catastrophically resulting in the loss of thousands of gallons of water and oftentimes causing significant damage to adjoining properties.  This project involves replacing 1,500 LF of 8” Techite Pipeline with new 12” PVC watermain. The project runs from 23050 Middlecamp Rd., cross country to a location where pavement begins on Lazy Z Ln. A temporary bypass pipeline will be needed.