The Mill Villa Well Water Treatment Project was completed to increase TUD’s water supply reliability during severe drought conditions and help meet customer demand while water use restrictions were in place. Although the Mill Villa Well was a productive groundwater source, elevated manganese levels prevented its use as part of the District’s domestic water system. To address this issue, TUD installed an iron and manganese removal treatment system that enabled the well to provide safe, treated drinking water.

Project work included the design, development, and construction management of the treatment facilities, installation of filtration equipment, and comprehensive water quality testing of both the well and the new treatment system. The completed project expanded TUD’s available water resources, strengthened drought preparedness, and improved the District’s ability to provide a reliable drinking water supply during periods of limited surface water availability.