On Call Field Serivces Agreement
Exhibit A- Summary of District Policies
Exhibit B- Insurance Requirements
Exhibit C- Safety Requirements
Exhibit D- Standard Public Works Contract Conditions
TUD Standard Details- Full Set
On Call Construction Time and Materials Estimate
Department of Industrial Relations Prevailing Wage Determinations
Caltrans Labor Surcharge and Equipment Rental Rates
TUD Staff Contact List
Project Description Tuolumne Utilities District is accepting on call estimates for Trucking Services at Sierra Pines Regional Water Treatment Facility. See attached for location and details. Note: The project duration
Project Description Tuolumne Utilities District is accepting on call estimates for a tree removal project at the Willow Springs Tank Site. TUD requests that tree removal be completed as soon
Project Description Tuolumne Utilities District is accepting on call estimates for a new manhole installation near 275 Snell Street. All of these projects will be in the street within the
Project Description Tuolumne Utilities District is accepting on call estimates for Water Main Bypass and Replacement near 94 Snell Street. Project completion will be coordinated with the City of Sonora’s
Project Description Tuolumne Utilities District is accepting on call estimates for approximately 0.75 acres of tree and brush removal along TUD’s Pedro Y Tank access road and around three sides
Project Description Tuolumne Utilities District is accepting on call estimates for Trench Patch Paving a length of 140′ on Shawnee Dr. and the intersection of Shawnee and Leland Dr. in
Project Description Tuolumne Utilities District is accepting on call estimates to construct a block building on a preconstructed concrete pad (dimensions: 16’x16’) at the Cedar Ridge Upper Tanks in Sonora,
Project Description Tuolumne Utilities District is accepting estimates from contractors on our current “On Call” list for four separate sewer repair projects. At the intersection of Yaney Ave and Oak
Project Description Tuolumne Utilities District is accepting estimates from contractors on our current “On Call” list to demolish an existing 126,000 gallon, bolted steel water tank at 19850 Villa Drive,