TUD PROJECTS AND INVITATION TO BID

Matelot Pipeline Project

Tuolumne Utilities District is accepting sealed proposals for the construction of the Matelot Pipeline Project. In general, the project will consist of the installation of 1,689 linear feet of 14-inch C900, including clearing and grubbing, and any necessary appurtenances near Pine Log Road in Columbia, Tuolumne County, CA.

A mandatory pre-bid conference will be held at the District’s Columbia Water Treatment Plant, 23310 Pine Log Road,  Columbia, California at 10:00 a.m. on Wednesday, May 19th, 2021. Proposals will only be accepted from contractors represented at the pre-bid conference.

For information concerning the proposed work contact: Ms. Jennifer Batt, Associate Engineer, (209) 532-5536, extension 526 or jbatt@tudwater.com.

Mandatory Pre-Bid Meeting:
Wednesday, May, 19th, 2021 – 10:00 am
23310 Pine Log Road,  Columbia, California

Bid Closes:
Friday, May 28, 2021, at 2:00 pm

Project Documents:
Addendum 1-Posted May 12, 2021
1) Contract Documents
2) Plan Set

 

Post Date:
May 10, 2021

Bid Closes:
May 28, 2021, by 2:00 PM

Sonora Regional Wastewater Treatment Facility (SRWWTF)

Bids for construction of the Project will be received at the Tuolumne Utilities District located at 18885 Nugget Blvd., Sonora, CA 95370, until Tuesday, June 1, 2021 at 3:00 PM local time. At that time, the Bids received will be publicly opened and read.  The Project consists of constructing the upgrades to the Sonora Regional Wastewater Treatment Facility to increase treatment capacity and improve effluent quality to meet regulatory permit requirements and accommodate future population growth.  The new facility will be capable of treating 5.0 MGD of Max Day Flows and will have a capacity for Peak Hour Flows of 10.0 MGD. Bids will only be accepted from eligible bidders.

Mandatory Pre-Bid Conference Meeting

A mandatory pre-bid conference for the project will be held on Wednesday, April 28, 2021 at 1:00 PM local time at the Sonora Regional Wastewater Treatment Facility, 1400 Southgate Drive, Sonora, CA 95370.

Contact:
Ms. Makayla Dillon
Tuolumne Utilities District
Management Analyst
mdillon@tudwater.com
209-532-5536 x 512

PROJECT DOCUMENTS

Eligible Bidders:

Auburn Constructors, LLC
Clark Bros., Inc.
Gateway Pacific Contractors, Inc.
GSE Construction Company, Inc.
James C. Cushman, Inc.
Kiewit Infrastructure West Co.
Mountain Cascade, Inc.
Obayashi Corporation
Overaa & Co.
W.M. Lyles Co.

 

Bid Closes
June 1, 2021 3:00 PM

2021 District Wide HMA Trench Paving

Sealed proposals for the construction of the 2021 District Wide HMA Trench Paving addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on April 19th, 2021, and will then be publicly opened and read. In general, the project will consist of trench patching approximately 10,000 sf of Type A Hot Mix Asphalt at 139 locations. Project includes sawcutting, and/or grinding, and removal of temporary surfaces as per Tuolumne County Standards & Specifications, as well as providing and implementing traffic control within Tuolumne County, CA. Square footage will increase during the contract due to ongoing District repairs.

Contact:
Ms. Makayla Dillon
Tuolumne Utilities District
Management Analyst
mdillon@tudwater.com
209-532-5536 x 512

VIEW BID DOCUMENTS

Post Date
April 2, 2021 

Bid Closes
April 19, 2021 by 2:00 PM

Techite Pipeline Replacement Project-Phase II

Sealed proposals for the construction of the Techite Pipeline Replacement Project – PHASE II addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on April 2, 2021, and will then be publicly opened and read.

In general, the project will consist of the replacement of 2,000 linear feet of 8-inch Techite water main with two (2) 12-inch PVC C900 DR 14 water main and appurtenances. Pipeline construction will occur outside of roadways on a cross country route. Extended water shutoffs will not be allowed. Contractors shall maintain service to downstream customers via temporary bypass or other approved means.

A mandatory pre-bid conference will be held at the District’s Administration Building at 18885 Nugget Blvd., Sonora, California at 9:00 a.m. on Thursday, March 18, 2021 and at 10:00 a.m.  on March 22nd. Bidders may choose one meeting to attend and will not be required to attend both. Proposals will only be accepted from contractors represented at one of the pre-bid conferences.

To request an Invitation to Bid and a digital copy of the plans and specifications, please contact Mrs. Makayla Dillon at (209) 532-5536 ext. 512 or mdillon@tudwater.com. Project information and addenda can be found on the District’s website: https://tudwater.com/development-services/bids/.

PROJECT DOCUMENTS
PROJECT PLAN SET DOCUMENT
Addendum No. 4 – Posted March 19, 2021
Addendum No. 3 – Posted March 15, 2021
Addendum No. 2 – Posted March 12, 2021
Addendum No. 1- Posted February 26, 2021

Notice is hereby given to prospective bidders that the Bid Documents for the above referenced project have been modified as hereinafter set forth. See attached Addendum No. 1.

Sealed proposals for the construction of the Techite Pipeline Replacement Project – PHASE II addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on March 26, 2021, and will then be publicly opened and read.

Post Date:
February 18, 2021

Mandatory Pre Bid Date:
Thursday, March 18, 2021 at 9:00am

Due Date:
April 2, 2021 by 2:00 PM

Contact:
Ms. Makayla Dillon
Tuolumne Utilities District
Management Analyst
mdillon@tudwater.com
209-532-5536 x 512

VIEW PROJECT DOCUMENTS

Post Date
February 18, 2021 

Bid Closes
April 2, 2021 by 2:00 PM

Phoenix Dam Spillway Rehabilitation Project

Proposals for the construction of the Tuolumne Utilities District – Phoenix Dam Spillway Rehabilitation Project may be submitted electronically via email to mdillon@tudwater.com and will be received until 2:00 p.m., local time, on Thursday, March 4, 2021. In general, the project will consist of the rehabilitation of the Phoenix Dam Spillway, including any necessary appurtenances on Phoenix Dam Spillway Rehabilitation Project, in Tuolumne County, CA.

To request an Invitation to Bid and a digital copy of the plans and specifications, please contact Mrs. Makayla Dillon at (209) 532‑5536 ext. 512 or mdillon@tudwater.com.  Project information and addenda can be found here on the District’s website. A mandatory pre-bid conference will be held at the project site in Sonora, California at 10:00 a.m. on Monday, February 22nd, 2021.  Proposals will only be accepted from contractors represented at the pre-bid conference. Registration for the pre- bid meeting is required, please contact Mrs. Makayla Dillon at (209) 532‑5536 ext. 512 or mdillon@tudwater.com.  For information concerning the proposed work contact:  Mrs. Makayla Dillon, Management Analyst, extension 512 or, Mr. Erik Johnson, District Engineer, extension 520 at the Tuolumne Utilities District (209) 532-5536.

For additional project details including the Contract Documents, click the Project Information Page link below.

Mandatory Pre Bid Date:

Registration Required
Meeting February 22, 2021 at 10:00 AM

Bids Due:

March 4, 2021 by 2 PM

 

VIEW PROJECT DETAILS PAGE

Post Date
February 5, 2021 

Bid Closes
March 4, 2021 by 2:00 PM

Sonora Regional Wastewater Treatment Plant Project

REQUEST FOR PRE-QUALIFICATION OF BIDDERS:

Notice is hereby given that Tuolumne Utilities District (TUD) has determined that all bidders on Sonora Regional Wastewater Treatment Facility Project to be undertaken by TUD must be pre-qualified prior to submitting a bid on that project. It is mandatory that all Contractors who intend to submit a bid fully complete the pre-qualification questionnaire, provide all materials requested herein, and be approved by TUD to be on the final qualified bidders list. No bid will be accepted from a Contractor that has failed to comply with these requirements.

The upgrades to the Sonora Regional Wastewater Treatment Plant are proposed to increase the treatment capacity and improve the effluent quality to meet regulatory permit requirements for future population growth. The facility will be capable of treating 5.0 MGD of Max Day Flows and will have a capacity for Peak Hour Flows of 10.0 MGD. 

PRE-QUALIFICATION QUESTIONNAIRE
COMPLETED QUESTIONNAIRE – DUE March 15, 2021 by 4pm PST

Addendum No. 1 – Posted March 10, 2021

Qualified Contractors should contact Makayla Dillon, Management Analyst, at 209-532-5536 ex. 512 or email mdillon@tudwater.com to be placed on a distribution list for all project information.

CONTACT:

Makayla Dillon
Management Analyst
Tuolumne Utilities District
209-532-5536 ext. 512
18885 Nugget Blvd | Sonora, CA 95370
mdillon@tudwater.com

MORE INFORMATION

Post Date
February 16, 2021

Close Date
April 9, 2021
by 4 PM PST