Mt. Provo Transmission and Intertie Project

Mt Provo Main

The Mt. Provo Transmission and Intertie Project improved water reliability, drought resilience, and fire protection for the communities of Ponderosa Hills and the Tuolumne Band of Me-Wuk Indians. Funded through a $2.84 million grant from the California Department of Water Resources’ Urban and Multibenefit Drought Relief Grant Program, the project included the installation of approximately 14,000 feet of new water transmission pipeline, two pressure-reducing stations, and ten fire hydrants in areas of elevated wildfire risk.

The completed project strengthened TUD’s water system by connecting the Ponderosa system to the Upper Basin system, allowing for the delivery of reliable, high-quality water while increasing storage capacity during drought conditions. The improvements also advanced long-term system consolidation efforts by reducing reliance on aging infrastructure, lowering future operation and maintenance costs, and supporting the continued resilience and growth of the Tuolumne Band of Me-Wuk Indians community.

Scroll to Top