Muller Mutual Consolidation

Muller Mutual Map

The Muller Mutual Water System (Muller) is in a state of disrepair with failing tanks, undersized mains, and failing valves. Muller has secured grant funding to replace their water system and consolidated with TUD. Muller’s design includes the installation of 6-inch and 8-inch water mains. The District desires to upsize the water main to provide operational flexibility, redundancy, reliability, and future treatment plant consolidation. The cost of upsizing the main is estimated to be $200,000.

With the exception of the cost to upsize the water main, all other costs will be covered by the grant, including design, project management, and construction.

Scroll to Top