Well Failure Relief Project

DWR logo

The TUD Well Failure Relief Project was completed to address widespread well failures caused by prolonged drought conditions throughout Tuolumne County. After evaluating impacted properties, Tuolumne Utilities District identified several projects where extending public water service offered a more sustainable and reliable solution than temporary water hauling. The project included new service connections, water main extensions, meter installations, backflow protection, and other infrastructure improvements needed to connect homes and a small community water system to treated drinking water service.

The completed improvements increased drought resilience, improved long-term water reliability for affected residents, and reduced dependence on emergency water deliveries. In total, the proposed relief efforts targeted multiple individual households as well as the Sleepy Hollow Water System, helping secure a dependable water supply for communities experiencing severe groundwater shortages during the drought.

Scroll to Top