Project Description
The Tuolumne Utilities District (District) invites submission of a Statement of Qualifications (SOQ), Project Proposal, and Design Fee Proposal to provide Design-Build (DB) services for the Progressive Design-Build delivery of the Sierra Pines Regional Water Treatment Facility (“the Project”). This procurement is a hybrid one-step process that satisfies the requirements of California Public Contracting Code (PCC) Section 22172. Please click the link below to download the RFQ and RFP.
Sierra Pines RFQ and RFP.
Proposal Due Date:
March 14th, 2025, by 2:00 p.m.
For additional information concerning the proposed work or to gain access to additional project resources, please contact: Mr. Gaddiel DeMattei, Associate Engineer II at (209) 532-5536, extension 519 or email at [email protected] .