Vertical Turbine Can Pump RFP

Project Description

Tuolumne Utilities District (TUD) invites pump suppliers to submit proposals for furnishing vertical turbine can pumps for the Sierra Pines Regional Water Treatment Facility Project.  The District seeks to contract with a pump supplier for four-(4) filter feed pumps, four-(4) effluent pumps, and three-(3) Zone 2 booster pumps.

Proposal Due Date

November 20, 2026 at 2pm

Proposal Submission

Proposals must be emailed or submitted in accordance with Section 2.4 of the RFP.

Submission Email:

[email protected]

cc: [email protected]

Project Documents:

Vertical Turbine Pumps RFP FINAL

Addendum No. 1 and No. 2

Please note, all contractors submitting a bid must sign and return the acknowledgment page in the packet.

Addendum No. 1 Documents

Addendum No. 2 Documents

Date Posted
10/22/2026
Bid Closes
November 20, 2026, at 2:00 PM local time.
Contact
Mr. Erik Johnson, District Engineer
(209) 532-5536, extension 520, [email protected]
Scroll to Top