275 SNELL STREET – MANHOLE – CLOSED

Project Description
Tuolumne Utilities District is accepting on call estimates for a new manhole installation near 275 Snell Street.

All of these projects will be in the street within the City of Sonora. The contractor will be responsible for:
*Obtaining the proper City of Sonora Encroachment Permits
*Proper notification to the City when the work will start
*Obtaining a valid USA Ticket for each project
*Adhering to TUD’s Standard Detail Drawings- see attached.
*Traffic Control
*Final Paving

See attached map for location and details.

Post Date
July 14, 2026

Proposal Due Date
July 24, 2026, by 10:00 AM

Submission Guidelines
Estimates should be submitted via email to [email protected]. Please note that we will only accept submissions via email due to potential post office time delays.

Project Documents
On Call Time Materials Estimate Form

Project Map

Standard Drawing – Details 31

Standard Drawings – Details 33

Note: This is not a bid, it is a time and materials estimate.  The Contractor is not guaranteed payment in the amount of this estimate.  Final payment will be based on actual cost-plus prescribed markups.  At the District’s option, material and equipment invoices along with payroll records may be requested before authorizing payment.

Date Posted
July 14, 2026
Due Date
July 24, 2026 @ 10:00 AM
Contact
Rich Pitcher
Collections Superintendent
(209) 532-5536 ext. 576
[email protected]
Scroll to Top